High-Precision RAVS Monitoring Device for Voltage Fluctuations - China Suppliers & Factory Solutions
Beidou/GPS timing
01Can be connected to a separate external time synchronization device or shared with the original system clock.
Voltage flicker
02If the difference between the maximum peak values of the two adjacent wave heads of the voltage waveform exceeds the set threshold, immediately start recording (-1~+30s).
Voltage sag
03If the voltage of any phase is lower than the set threshold, immediately start recording (-1~+30s).
Voltage oscillation
04Oscillation is difficult to prevent and poses serious harm. When the oscillation amplitude exceeds the set threshold, immediately start recording (-1~+30s).
Voltage deviation
05The transient voltage waveform contains a DC component, and when the amplitude exceeds the set threshold, the recording is immediately initiated (-1~+30s).
Voltage surge
06External surge, power transmission, protrusion, sudden load rejection, etc., exceeding the set threshold, immediately start recording (-1~+30s).
Voltage grounding
07When a single-phase grounding fault occurs in the system, accurately identify the fault and its occurrence time, and immediately start recording (-1~+30s).
Voltage short circuit
08When a phase to phase short circuit fault occurs in the system, accurately identify the fault and its occurrence time, and immediately start recording (-1~+30s).
Routine power quality monitoring
09Voltage fluctuation, load current, power analysis, THD monitoring, imbalance monitoring, etc. No need to install other power quality monitors.
Main Spec
10Sampling frequency 100kHz; monitor 0-63 harmonics, inter harmonics, and higher harmonics; 4G memory, 64G solid-state drive; LCD high brightness TFT LCD touch screen; 10 inches; Resolution 800 × 600; one × RS-232/485, 1 × RS232, 4 × USB2.0, 1 × VGA, 1 × GigaLAN.
★ Technical Level
- High sampling frequency: 20kHz (sampling time: 83ms → 50ms)
- More duration time recording: -1~+30s (panoramic recording)
- More duration time when power loss: 60s
- Accurate time synchronization function: Beidou or GPS
- Stronger analysis capabilities: Real time analysis of various voltage issues
- Solution Recommendation: Based on the analysis results of panoramic recording, recommend the most reasonable solution
★ Process Level
- Change the touch screen to 10 inches
- Improve wiring methods: wiring terminals, wiring methods, etc
- High strength anti vibration structural design
- Artwork style full art design
Frequently Asked Questions
How does the device handle voltage anomalies like sags, surges, and oscillations?
When the voltage sags, surges, or oscillations exceed the pre-set threshold, the system immediately starts recording with a panoramic recording duration of -1 to +30 seconds.
What are the time synchronization options available?
The system supports Beidou and GPS timing. It can be connected to a separate external time synchronization device or shared directly with the original system clock.
Does the system require external power quality monitors for routine checks?
No, it does not. The system features built-in routine power quality monitoring, including voltage fluctuation, load current, power analysis, THD monitoring, and imbalance monitoring.
What are the key technical specifications of the display and hardware?
The device features a 10-inch high brightness TFT LCD touch screen with an 800 x 600 resolution. Hardware includes a 100kHz sampling frequency, 4G memory, 64G solid-state drive, and multiple interfaces like RS-232/485, USB 2.0, VGA, and GigaLAN.
What improvements have been made to the technical and process levels?
Technical improvements include a high sampling frequency of 20kHz, 60s duration during power loss, and panoramic recording. Process upgrades include a larger 10-inch touch screen, improved terminal wiring methods, high-strength anti-vibration structural design, and an artwork style design.